Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Production well, approximately 1” - 10” of storm water in the secondary containment, there is a rubber hose coming from the storm water inside the secondary containment to outside of the secondary containment (see picture), digital pipeline meter on location, otherwise a clean site. No enforcement at this time.MP
|