Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fluid level test conducted on 10/12 = Tubing - 502' @ 31 PSI, Casing - 688' @ 1 PSI, vegetation over location is 5 to 6 foot tall. No enforcement at this time.MP
|