Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Witness casing IOPT for producing well; the line pressure was 57.7 PSI with the current flow of 221 MCF and the 24-hour flow rate was 179.5 MCFD; approximately 6” of storm water in the secondary containment; otherwise a clean location.
|