Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fluid level test conducted on 01/12/17 = Tubing - 3990' @ 677 PSI, Casing - 3840' @ 0 PSI, clean location.
|